Auckland

Auckland Property

January 2021

At Karaka Lodge, Liquid Electrical Limited executed an elaborate electrical project, meticulously addressing the multifaceted requirements of this prestigious property. The project spanned several areas, including individual suites, communal spaces, and external installations, reflecting a holistic approach to electrical infrastructure enhancement and maintenance.

Detailed Project Execution at Karaka Lodge:

  • Suite Enhancements:

    In this large scale luxuary project consisted of individual suites, our focus was to create a harmonious blend of comfort and functionality. This included installing elegant pendant and wall light fittings in bedrooms and living areas, setting up heated towel rail sets in bathrooms for added luxury, and ensuring all lighting solutions were both practical and aesthetic. Data plates under TVs were installed for seamless connectivity, and specific lighting controls (the Lutron system), were implemented for customizable room ambiance.

  • Common Areas and External Spaces:

    In the communal areas, tasks included installing comprehensive lighting solutions such as emergency lights, luxary pendant lights, and wall lights. Outdoor areas saw the addition of heat-resistant light fittings and earth bonding for safety and durability. The intricate lighting setups were designed to enhance both the interior and exterior appeal of the lodge, with special attention to emergency and security lighting systems.

  • Technical Installations and Upgrades:

    The project involved detailed technical tasks like setting up ironing controls, managing fire panel contacts, and installing specific power supplies for critical areas like the motor control center and pump rooms. Gas solenoid shutoff connections were established to ensure safety in utility areas.

  • Custom Solutions and Repairs:

    In this high end home, we developed tailored soloutions to surpass the unique needs of client, including custom lighting driver panels, septic and telecommunications infrastructure repairs, and the installation of specialized equipment like sauna fans and MATV outlets. The team also addressed post-flood repairs, focusing on restoring damaged conduits and electrical systems to full functionality.

  • Infrastructure and Safety Compliance:

    The project included significant infrastructure work such as installing main earth electrodes, conducting lighting and power cable installations, and ensuring all new installations complied with current safety standards. The electrical systems were thoroughly tested and adjusted to ensure reliable operation and compliance with local regulations.

  • Ongoing Support and Maintenance:

    Liquid Electrical provided continuous support throughout the project, from initial assessments and installations to final testing and commissioning. This included preparing the property for future upgrades, with provisions for additional cabling and energy-efficient solutions.

Previous
Previous

Glenmore Road