North Shore, Auckland

Ridge Road

Project Information

For the project: Ridge Road, Auckland, We provided an advanced electrical solution, focusing on reliability and seamless power transition for the property. The project showcased our expertise in integrating high-end power backup systems with sophisticated automation to ensure uninterrupted power supply and optimal performance. The Ridge Road project also involved a specialized electrical infrastructure upgrade focusing on the cinema room, enhancing power delivery and safety

Key Features

  • Advanced Power Backup System:

    The installation of a two-stage backup system, including a high-end APC 40kVA UPS and a top-of-the-line Cummins 60kVA generator, demonstrated our commitment to providing reliable and efficient power solutions. This system was designed to seamlessly handle power transitions, maintaining stability during outages and ensuring the property's critical systems remain operational.

  • Seamless Automatic Power Transition:

    The setup included an Automatic Changeover Switch (ATS) to ensure a smooth switch between the main power supply and the generator, minimizing the downtime and reducing the risk of power interruption. The UPS system provided an additional layer of power stability, bridging the gap during transitions and protecting against voltage spikes and transient signals.

  • Customized Power Solutions:

    Different configurations were offered to meet the client's specific needs, from basic generator setups to more advanced systems incorporating UPS for no power drop during transitions. These options allowed for a tailored approach, ensuring the best fit for the property's requirements.

  • Quality and Compliance:

    Our estimate included not only the installation and hardware costs but also compliance with safety and regulatory standards, reflecting our holistic approach to project management. The proposal emphasized the use of fire-rated cables and adherence to stringent installation practices.

  • Cinema Power Cabling Upgrade:

  • The core of the project was the replacement of existing cinema power cabling with new, high-quality 2.5mm 2C+E TPS cabling. This upgrade was aimed at handling increased load demands, ensuring reliable and uninterrupted power supply for an enhanced cinema experience.

  • Additional Circuit Installation:

    To accommodate the power requirements and to ensure electrical safety and efficiency, an additional circuit was installed specifically for the cinema end of the house. This strategic enhancement was designed to balance the load and improve the overall electrical system performance.

  • Arc Fault Detection Installation:

    A significant safety improvement was the installation of arc fault detectors on the cinema circuits. These devices are crucial in preventing electrical fires by detecting and interrupting arc faults, thereby enhancing the safety of the property's occupants.

  • Comprehensive Service Approach:

    The project included a detailed assessment and tidy-up of the roof space cabling, ensuring optimal layout and functionality. Our service covered all aspects of the installation, from the initial cabling replacement to the final safety checks and certification.